Pakistan: Passengers left stranded as parts of Karakoram Highway in Khyber Pakhtunkhwa close off after rainfall

By ANI | Published: July 1, 2023 02:53 AM2023-07-01T02:53:09+5:302023-07-01T02:55:10+5:30

Khyber Pakhtunkhwa [Pakistan], July 1 : A large number of travellers were on Friday morning left stranded after the ...

Pakistan: Passengers left stranded as parts of Karakoram Highway in Khyber Pakhtunkhwa close off after rainfall | Pakistan: Passengers left stranded as parts of Karakoram Highway in Khyber Pakhtunkhwa close off after rainfall

Pakistan: Passengers left stranded as parts of Karakoram Highway in Khyber Pakhtunkhwa close off after rainfall

Khyber Pakhtunkhwa [Pakistan], July 1 : A large number of travellers were on Friday morning left stranded after the main Karakoram Highway and connected roads in Khyber Pakhtunkhwa were cut off after a spell of heavy rainfall, Dawn reported.

Dawn is a Pakistani English-language newspaper.

Heavy monsoon rains, coupled with strong winds, lashed across areas such as Shangla's Bisham tehsil and Hazara's Kohistan, Battagram, and Torghar districts. The rains caused streams and rivers to overflow, bringing rubble along with them. This led to blockades and road closures, cutting off the route to Gilgit Baltistan.

According to Bisham Station House Officer Bakht Zahir, the Karakoram Highway was obstructed at over 30 points, and passengers were stuck on both tracks of the highway, particularly tourists travelling for GB and other northern areas.

He said the relevant authority is being engaged to clear the road on at least one side so that motorists can make it across.

A passenger stuck in the Shang River side, Zahid Khan, told Dawn that he was travelling to Bisham from Mansehra with his family and got stranded there. He added that he was waiting for the road to open for traffic.

Khan said they took the risk to cross over some rubble resulting in damage to their vehicle, which would have to be towed away.

Deputy director for the National Highway Authority for Shangla and Kohistan, Ghulam Abbas confirmed the road blockades as well and said their contractor Frontier Works Organisation was clearing the road for "one-side traffic initially".

He said the Karakoram Highway was blocked at various identified locations locations numbered 211, 213, 215, 267 and 283 and that the rest were minor obstructions from where the rubble would be removed once it has been from the major blockades.

Abbas further said the road between Dandai and Kohistan of Shangla and Kohistan areas was blocked adding that most slides were shut off in the Bisham tehsil of Shangla, as per Dawn.

Abdullah, a local resident of Landai Jai Bisham, said their link road was completely cut off at several points, suspending road communication to their area.

He said the residents there wanted the authorities to clear the road as soon as possible.

Official reports about house damage and any possible casualties were yet to be received due to the Eid holidays.

Recently, three people were killed and eight others were injured in rain-related incidents in different parts of KP.

The Pakistan Meteorological Department had predicted windstorms, thunderstorms and rain in Abbottabad, Mansehra, Haripur, Battagram, Torghar, Kohistan, Shangla, Chitral, Lower and Upper Dir, Swat, Buner, Malakand, Bajaur, Mohmand, Mardan, Swabi, Nowshera, Charsadda, Peshawar, Khyber, Kohat, Hangu, Karak, Orakzai, Kurram, Bannu, Lakki Marwat, Tank, Dera Ismail Khan, and North and South Waziristan districts, as per Dawn.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in app