DMRC using 3D model-based technology to work remotely on Phase IV project

By IANS | Published: August 19, 2020 04:56 PM2020-08-19T16:56:05+5:302020-08-19T17:10:26+5:30

D model-based process to ideate, plan and finalise the designs of structures for its Phase IV project. The DMRC ...

DMRC using 3D model-based technology to work remotely on Phase IV project | DMRC using 3D model-based technology to work remotely on Phase IV project

DMRC using 3D model-based technology to work remotely on Phase IV project

D model-based process to ideate, plan and finalise the designs of structures for its Phase IV project.

The DMRC had commenced the construction work for Phase IV in December last year, but it came to a screeching halt due to the nationwide lockdown. Following this, the rail corporation used building information modelling

( With inputs from IANS )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in app
Tags :Dmrc